Quick answer: For a cabinet and countertop kitchen remodel, plan to split your budget about 50% on products (cabinets and countertops) and 50% on installation. Once your materials are ready, the installation takes about one week. Your total depends on kitchen size, cabinet type, and countertop material, so always get an itemised written estimate.
Kitchen remodelling in Orlando doesn’t have to mean gutting the whole room. Many homeowners get the biggest visual change from new cabinets and countertops alone. This guide explains what that costs, how the work happens, and how long it takes.
What Does This Remodel Include?
This guide covers two things:
- Cabinet installation: removing old cabinets and installing new ones
- Countertop installation: removing old countertops and installing new granite, quartz, quartzite, or marble
It does not cover flooring, appliances, plumbing, or electrical work. Those are separate projects with their own costs and schedules.
How Much Does Kitchen Remodelling in Orlando Cost?
Use a simple rule: 50% of your budget goes to products, and 50% goes to installation.
- Products (50%): cabinet boxes, doors, hardware, and countertop slabs
- Installation (50%): removal of old materials, labour, levelling, anchoring, cutouts, seam finishing, sealing, and cleanup
What raises the price:
- Custom cabinets instead of RTA or semi-custom
- Natural stone such as quartzite or marble
- Complex layouts, islands, or many cutouts
- Extra seams or special edge profiles
What lowers the price:
- RTA or stock cabinet lines
- Simple door styles like shaker
- Factory-direct sourcing
- Keeping your existing layout
Why Split the Budget 50/50?
Many homeowners spend nearly everything on materials and forget that installation quality decides how long the kitchen lasts. Cabinets that aren’t level, or countertop seams that are poorly placed, are visible every day. Budgeting equally for installation protects your investment in the products.
Cabinet Installation in Miami and Beyond
Good cabinet installation in Miami and across South Florida includes:
- Removing old cabinets safely and checking walls for damage
- Locating studs and anchoring cabinets securely
- Levelling every box so doors and drawers align
- Installing doors, drawers, soft-close hinges, and hardware
- Adjusting everything for even gaps
Ask whether your installer works with both RTA and pre-assembled cabinets. RTA cabinets arrive flat and need assembly, which affects labour time.
Countertop Installation in Hialeah and Beyond
Quality countertop installation in Hialeah includes:
- Accurate measurements and templating
- Careful slab selection for veining and colour
- Seam placement that is hard to see
- Sink and cooktop cutouts
- Sealing for natural stone such as granite and marble
Ask who takes the final measurements and where seams will go before fabrication starts.
How Long Does Installation Take?
The installation itself takes about one week, once your cabinets and countertops are ready for installation. Here is a typical schedule:
Day | Work |
Day 1 | Site protection, removal of old cabinets and countertops |
Days 2 to 3 | Cabinet installation, levelling, doors and hardware |
Days 4 to 5 | Countertop installation, seams, cutouts, sealing |
Days 6 to 7 | Final adjustments, cleanup, and walkthrough |
Your timeline starts before installation, with design, material selection, and ordering. Ask your contractor for the full schedule in writing.
The Steps of a Cabinet and Countertop Remodel
- Set your budget using the 50/50 split.
- Book a free design consultation and take measurements.
- Choose cabinets and countertops in a showroom so you can see real samples.
- Approve an itemised estimate that separates products from installation.
- Order materials and confirm delivery dates.
- Complete the one-week installation.
- Do a final walkthrough and check every door, drawer, and seam.
How to Choose a Kitchen Remodel Contractor
Whether you’re comparing kitchen remodel contractors in Miramar or hiring in Orlando, check these:
- Verified license and liability insurance (confirm on Florida’s DBPR website)
- Itemised estimates that split products from labour
- Recent reviews and photos of finished kitchens
- A written timeline and warranty
- A local showroom
If you’re planning a home renovation in Hialeah with several rooms, ask whether the contractor can schedule the work in phases.
What Makes the Best Remodelling Company in Miami?
No official ranking decides this, so judge by evidence. The best remodelling company in Miami will offer transparent pricing, verified credentials, strong recent reviews, clear communication, and a written warranty. A company that supplies and installs both cabinets and countertops also reduces scheduling gaps and finger-pointing.
Frequently Asked Questions
How much should I budget for installation?
About 50% of your total budget. The other 50% goes to cabinets and countertops.
How long does cabinet and countertop installation take?
About one week once the materials are ready.
Do I need a permit?
Cabinet and countertop swaps often need less permitting than structural work, but requirements vary by city. Ask your contractor.
Can I stay home during installation?
Yes. Expect limited kitchen use for the week, so plan a temporary cooking area.
Is it cheaper to buy materials and installation from one company?
Often yes, because you avoid duplicate markups and scheduling conflicts.
Final Thoughts
A cabinet and countertop remodel is one of the fastest ways to refresh your kitchen. Split your budget evenly between products and installation, choose materials in person, and confirm the one-week installation schedule in writing.
Ready to plan your kitchen? HRM Florida offers free consultations and transparent estimates, with showrooms in Orlando, Hialeah, and Pompano Beach. Call Orlando at (407) 900-5363 or Hialeah at (954) 553-9009.


